Zalloum & Associates (Z&A) were the Project Management Consultants (PMC) from the review of process configuration, through basic design, engineering. construction and commissioning.
* Khartoum Refinery Company (KRC)
 
A JVC between the Government of Sudan (MEM) & China National petroleum Company.
This 100000 B/D ultra – modern refinery was expanded from 50000 B/D. The expanded refinery processed the world’s toughest crude oil from Sudan Block 6 crude containing the world’s highest TAN crude oil as well as the highest metal contents and crude in the world. The units involved in the expansion were:
* 2 X 1.000.000 T/Y Delayed Coking Units.
* 400000 T/Y Continuous Catalytic Reforming Unit.
* 1200000 T/Y Hydrotreating Unit for Gasoline and Diesel.
* Upgrading RFCC unit to 1800000 T/Y.
* New Central Control room with DCS.
* New Power Station (30 MW).
* New Tankage, off sites and utilities.

* شركة مصفاة الخرطوم

وهي شركة مشتركة بين دولة السودان وشركة البترول الوطنية الصينية. ولقد تم رفع الطاقة الإنتاجية للتكرير لهذه المصفاة الحديثة من 50 إلى 100 ألف برميل يومياً. وكمية التكرير الإضافية استوجبت الوحدات المذكورة أعلاه، وهي أول مصفاة بالعالم تكرر هذا النوع من البترول الخام ذي المواصفات الصعبة خصوصاً كونه يحتوي على أعلى معدلات المعادن والرقم الحامضي في العالم.